Projects in Progress

Dawn Walton
Manager, Business Support
Recreation Division
Phone: 905-546-2424 ext 4755
Email: [email protected]
Current Projects
The City of Hamilton is dedicated to providing residents with safe and efficient community recreation centres. The lifecycle renewal upgrades and enhancements scheduled at Huntington Park Recreation Centre from Monday, March 17, 2025 to late Fall 2025 will result in an updated facility featuring a new waterslide, pool, deck and changeroom updates as well as paint refresh in several spaces throughout the centre.
During the closure, individuals are encouraged to attend drop-in and registered programs at the following locations:
- Hill Park Recreation Centre
- Stoney Creek Recreation Centre
- Valley Park Community Centre
The City of Hamilton thanks residents for their patience as we complete this required work.
The City of Hamilton is pleased to share that the following work is planned to be completed at the facility during the closure period with an additional funding contribution from the Ward 6 Capital Re-Investment Reserve:
Planned Project Scope
- Removal and installation of a new pool water slide
- Pool basin and deck tile replacement
- Wall painting, flooring, tile replacement and fixtures within the pool changerooms
- Wall painting, flooring and fixtures as required within the facility washrooms.
Additional Project Scope – Ward 6 Capital Re-Investment Reserve Funded
- Washroom and changeroom partition replacements as required.
- Flooring upgrades in identified program spaces.
- Interior painting refresh in program rooms and hallways
- Community kitchen refresh
- Pool deck, lobby, hallways and office LED lighting upgrades.
- Pool mechanical maintenance
- Automatic door enhancement/replacement in identified spaces.
- Exterior walkway repairs
- Exterior stucco repair and painting refresh.