The Utility Installation and Permit Manual applies to all utility companies, commissions, agencies, boards, associations, municipal departments, and private or third party stakeholder applicants proposing to undertake work within City of Hamilton streets.
The purpose of the Utility Installation and Permit Manual is to provide:
- the efficient review of applications, pertaining to utility and any other structure installations that may conflict with utilities within City of Hamilton streets and rights-of-way, or other lands owned and maintained by the City.
- standards and processes for the design and installation of utilities within the municipal right-of-way to ensure that required safety criteria and procedures are being followed and adhered to, clearances and separations are maintained, and that physical space is optimally utilized.
Right-of-Way Utility Installation and Permit Manual
Appendices
Appendix A - Permit Application Offices Appendix B - Utility Contacts for Permit Process & Mark-up Appendix C - Temporary Backfill Restoration Appendix D - Tree Protection Policy Appendix E - Traffic Control Guidelines Appendix F - Depth of Cover Appendix G - Municipal Consent Permit Appendix H - Permits Required to Perform Work Appendix I - Project Information Sign Appendix J - Vertical and Horizontal Clearance Guidelines Appendix K - Standard Utility Location ROW Drawings Appendix L - Permit Drawing Standards Appendix M - Minimum Location Certificate Requirements Appendix N - Minimum Requirements for Visibility Clearance Appendix O - Work Instruction for Municipal Consent Applications Appendix P - Work Instruction for Municipal Consent Permit Closures