Environmental Assessments
Elevated Water Storage Facility and Pumping Station for Pressure District 7
Contact Us
Winston Wang, Project Manager
Water & Wastewater Systems Planning
Call 905-546-2424 ext. 4092
Email [email protected]
The City of Hamilton initiated the Class EA process to identify the preferred sites for a new Elevated Water Storage Facility (ESWF) and a new Pumping Station at Pressure District (PD) 7 within the Southeast Mountain Area. This EA provides water supply for future growth in Elfrida.
Location: Southeast Mountain Area near Pressure Districts 7 & 23 within the Elfrida Study Area.
Study status: Completed (2019)
Classification: Schedule B
Project File Report
Elevated Water Storage Facility and Pumping Station for Pressure District 7 Pro… Appendix A - Technical Memorandum No. 1 Hydraulic Capacity Analysis Appendix B - Technical Memorandum No. 2 Conceptual Design Appendix C - Geotechnical and Hydrogeological Desktop Study Appendix D - Archaeological Investigations Appendix E - Cultural and Built Heritage Investigation Appendix F - Natural Heritage Features Investigation Appendix G - Public Consultation Plan Appendix H - Summary of PIC 1 and Summary of PIC 2 Appendix I - Agency and Public Correspondence Appendix J - Indigenous Communities Correspondence
Date modified