Highway 8 (Dewitt Road to Fifty Road) Improvements
If you have any questions or comments or want to be added to the study mailing list, contact:
Margaret Fazio, Senior Project Manager
Infrastructure Planning
Call 905-546-2424 ext. 2218
Email [email protected]
The City initiated the Class EA process for Highway 8 Improvements from Dewitt Road to Fifty Road. Based on previously completed studies, it was identified that improvements would be required within the corridor to address roadway capacity, transit, active transportation and goods movement as a result of the future growth within the Fruitland-Winona Secondary Plan area.
March 2021 Update: Traffic analysis has determined that Highway 8 west of Fruitland Road to Dewitt Road will require widening to four lanes. As such, the Highway 8 EA has been expanded to include Dewitt Road to Fifty Road.
Location: Highway 8 (Dewitt Road to Fifty Road) is located within the Fruitland-Winona Secondary Plan.
Study status: Active
Classification: Schedule C (Phase 3 & 4)