Environmental Assessments
Mohawk Road (McNiven Road to Hwy 403)
Contact Us
Megan Salvucci, Project Manager
Asset Management
Call 905-546-2424 ext. 4101
Email [email protected]
The City initiated the Municipal Class EA process to develop and assess design alternatives that address transportation issues along Mohawk Road from McNiven Road to Highway 403.
The Ancaster Transportation Master Plan (ATMP) reviewed transportation issues in Ancaster. The ATMP identified Mohawk Road with the need for road widening improvements – three lanes with two-way left turn lane (TWLTL). This stretch of road is a two-lane road with urban and rural cross sections. Sidewalks exist sporadically along the road.
Location: Mohawk Road from McNiven Road to Hwy 403
Study status: Completed (2019)
Classification: Schedule C (Phases 3 & 4)
Environmental Study Report
Mohawk Road Environmental Study Report Appendix A - Transportation and Traffic Assessment Report Appendix B - Natural Heritage Report Appendix C - Tree Management Plan Report Appendix D - Drainage and Stormwater Management Report Appendix E - Notice of Study Commencement and Public Information Centre #1 Appendix F - Alternative Design Concepts Appendix G - Public Information Centre #2 Appendix H - Pedestrian Crossing Treatment Review
Date modified