Waterdown Trunk Watermain Twinning Class
For more information, to submit a comment, or be added to the mailing list, contact:
Udo Ehrenberg, Project Manager
Water Planning
Call 905-973-2358
Email [email protected]
The City has initiated the Municipal Class EA process to construct the twinning trunk watermain for more reliable water services in Waterdown community.
The need for watermain twinning at downstream of Pumping Station (PS) #16 was identified in the City’s Drinking Water Quality Management System (DWQMS) Infrastructure Review due to the criticality of the single trunk main to supply water to Waterdown community, as described in the City's Water and Wasterwater Master Plan (2006).
The purpose of this Class EA study is to determine the preferred alternative to construct the trunk watermain twinning within the study area.
Study status: Active
Classification: Schedule B (Phases 1 and 2)